Projects
St. Ann's Village (124 Cochituate Road):
Herb Chambers (533 Boston Post Road):
- NOI Application (Jan. 2023); rev. July 2023
- Chapter 194 Application (Jan. 2023)
- Stormwater Management Report (Jan. 2023); rev June 2023
- Stormwater Peer Review, Horsley-Witten Group (May 2023); Second Peer Review and Comments (June 2023)
- Response to HW Peer Review (June 2023)
- NOI Peer Review, NEC (April 2023); Second Peer Review (June 2023)
- Response to NEC Peer Review (July 2023)
- Site Development Plans (Jan. 2023); rev July 2023
COA (Development at 4, 8, 14 Andrew Ave/368 Boston Post Road):
- Response to Peer Review Comments (November 2023)
- Peer Review Comments by DGT Associates (May 2023)
- Construction Period Pollution Prevention Plan (May 2023)
- Long-term O & M and Pollution Prevention Plan (May 2023)
- Conservation Commission Comment Response Letter (Jan. 2023)
- NOI Application (Dec. 2022); rev. Jan. 2023
- Stormwater Management Report (Dec. 2022); rev. Jan. 2023; rev. May 2023
- Stormwater Analysis (May 2023)
- Site Plans (Dec. 2022); rev. Jan. 2023; rev. May 2023
- Chapter 194 Application (Dec. 2022); rev. Jan. 2023
Cascade (Development at 113-115 Boston Post Road):
Request for Information Letter from MassDEP (February 2024); Response Letter from Marta Nover (March 2024); Response from Conservation Commission (April 2024); Response from Scott Horsely (May 2024)
Request for a Superceding Order of Conditions to DEP (December 2023)
Denial for an Order of Conditions by the Conservation Commission (November 2023)
Stormwater Peer Review: BETA group comments (Jan. 2023); Additional Comments June 2023; Third Letter September 2023
NOI Peer Review: NEC comments (Jan. 2023); Additional Comments June 2023; Third Letter July 2023
24 School Street:
- NOI Submittal (Sept. 2017); ANRAD (Nov. 2015); NOI Submittal (December 2020); Revisions Packet and Plans (Dec. 2022)
- Existing Conditions plan; Proposed Site Plan (Nov.2017)
- Stormwater Report (Sept. 2017); Mounding Analysis (May 2017);
- Scott Horsely Review Letter (Oct. 2017); Presentation to Commission
- Conservation Commission Comments to Planning Board (Feb. 2017); ConCom Letter to ZBA (July 2017)
- TEC Peer Review (Oct. 2017); M. A. Kablack Peer Review (Nov. 2017); L. Hansen Comments (Oct. 2017); CLAWE Response (Nov. 2017)
- Wayland Conservation Commission: Attachment to Order of Conditions (October 2018)
- MassDEP Pre-Hearing Conference Report and Order (September 2019)
- MassDEP Superseding Order of Conditions (denial) 24 School Street
- Correspondence (November 2020-September 2023)
- Ecotec Peer Review (Summer 2023)
- Combined Mounding Analysis Files (CLAWE, GHC, 2020); Comment Letters from Scott Horsely for Review
- Mounding Analysis Peer Review for the Conservation Commission by Dr. J. Matthew Davis (Feb. 2024)
- Comments from McDonald-Morrisey, Peer Reviewer for abutter George Bernard (Feb. 2024)
5 Paths / 57A Shaw Drive
- SMLD Application_01.2021
- Tree Removal Plan_01.2021
- Plans_07.2019
- Long Term Pollution Prevention and Stormwater System Operation and Maintenace Plan_Revised 07.14.2020
- Stormwater Management Report_Revised 07.14.2020
- Stormwater Pollution Prevention Plan_10.2020
- BSC Group Peer Review_07.30.2020
- BSC Group Peer Review_08.21.2020
- BSC Group Peer Review_08.14.2020
Wayland High School
- Weston and Sampson Memo with Surface Water and Monitoring Well PFAS Testing Results and Analysis for November 4, 2021 Samples
- Weston and Sampson Monitoring Well Test Results Table for November 4, 2021 Samples
- Weston and Sampson Surface Water Test Results Table for November 4, 2021 Samples
- Weston & Sampson High School Surface Water PFAS Testing Results, Updated 9/2/2021
- Weston & Sampson High School Groundwater PFAS Testing Results, Updated 9/3/2021
- Weston and Sampson Memo with Surface Water PFAS Testing Results and Analysis for August 6, 2021 Samples
- PFAS Analysis Results Compilation 10/19 - 4/21
- Water Sampling Test Results
- Chapter 194 Permit: November 16th, 2018
- Attachment to Order of Conditions
- MASS DEP Order of Conditions
- Notice of Intent, Stormwater Management, and Site Plans
- Weston & Sampson Updated Information: August 16, 2018
- Response Letter to High School Submission: Tom Sciacca
- Chapter 194 Permit: Issued on November 21, 2006
- RCOC Wayland High School Building
- RCOC Wayland High School Fields
- BSC Group Peer Review
- Weston & Sampson Comments on Peer Review
- Infill Options Report
- Stormwater Report: Revised September 10, 2018
- Request for Certificate of Compliance: Wayland High School Building
- Request for Certificate of Compliance: Wayland High School Field
- Peer Review Response to BSC Comments
- Weston & Sampson Response to Comments from Notice of Intent Submittals
- BSC Group Peer Review Comments: September 26, 2018